What are G98 and G99 applications?

These are the two application routes for connecting your solar PV system to the local electricity network. G98 is a straightforward notification for small systems (up to 3.68kW inverter on a single-phase supply). G99 requires prior DNO approval and is necessary for larger systems or those with higher export potential.

Get in Touch

Full Name
Email Address
Phone Number
Message
Solar Panels Installation